$33.8M Frayser Community High School Phase 2 in Memphis Demands 7 Low Voltage Systems
Building 5 Phase 2 of the $150 million Frayser Community High School in Memphis requires seven low voltage systems including structured cabling, AV, fire alarm, access control, CCTV, DAS, and sound reinforcement. Turner Construction leads this $33.8 million phase with an estimated $2.5 million in LV contract value.
Apr 16, 2026
$137M Coast Guard Base Seattle Modernization Requires 6 Low Voltage Systems
The U.S. Coast Guard''s $137 million Base Seattle modernization requires six low voltage systems including structured cabling, access control, CCTV, fire alarm, DAS, and lighting control. Whiting-Turner leads this Phase 1A waterfront recapitalization with an estimated $7.9 million in LV contract value.
Apr 15, 2026
$36.8M Commercial Building in Denver Requires 6 Low Voltage Systems
A $36.8 million commercial building in Denver requires six low voltage systems including structured cabling, building automation, and access control. PaulsCorp LLC is the general contractor, with an estimated $2.58 million in LV contract value.
Apr 15, 2026
Cedars-Sinai's $120M Research Facility in Los Angeles Requires 6 Low Voltage Systems
A $120 million, 10-story research facility at Cedars-Sinai Medical Center in Los Angeles requires six low voltage systems. The estimated LV contract value exceeds $7.2 million.
Apr 14, 2026
Cleveland Clinic's $265M Cancer Center Expansion Requires 7 Low Voltage Systems
Cleveland Clinic''s $265 million Fairview Hospital expansion in Cleveland includes a 168,000 SF cancer center requiring 7 low voltage systems. The estimated LV contract value exceeds $10 million, covering structured cabling, DAS, nurse call, fire alarm, access control, CCTV, and AV.
Apr 14, 2026
$17M Boutique Hotel in Austin Creates Major LV Opportunity at The Inn at Green Pastures
A $17 million boutique hotel in Austin requires seven low voltage systems including guest room technology, POS, and AV across multiple venues. The Inn at Green Pastures, managed by La Corsha Hospitality Group, represents an estimated $1.19 million LV opportunity.
Apr 14, 2026
LVN Signal Now Tracks Anaheim, California: Real-Time Construction Intelligence for Low Voltage Contractors
Anaheim, California is now live on LVN Signal. Low voltage contractors working in the Anaheim metro area have access to real-time construction intelligence covering 248+ active projects — with 117 new permits and projects added just this week.
Apr 13, 2026
$18.1M Marriott TownePlace Suites in Downtown Raleigh Requires 7 Low Voltage Systems
An $18.1 million Marriott TownePlace Suites is under construction at 415 S Blount St in downtown Raleigh, requiring seven low voltage systems including structured cabling, guest room technology, and access control. Matthews Construction is the general contractor, with an estimated $1.27 million in LV contract value.
Apr 13, 2026
$61M Amazon Warehouse Conversion in San Antonio Demands 6 Low Voltage Systems
Amazon is investing $61 million to convert a 560,000-square-foot warehouse at 810 Rosillo Creek Blvd in San Antonio into a multi-use operations facility requiring six low voltage systems. The estimated LV contract value exceeds $3.1 million, covering structured cabling, access control, CCTV, AV, fire alarm, and DAS.
Apr 12, 2026
$95M Mixed-Use Project in Columbus Demands 6 Low Voltage Systems
A $95 million mixed-use structural project at 800 W North Broadway in Columbus, Ohio requires six low voltage systems including structured cabling, access control, CCTV, fire alarm, AV, and DAS. With Walker Consultants as the general contractor and an estimated $5.7 million in LV contract value, this is one of the largest active LV opportunities in the Midwest.
Apr 11, 2026
$400K Robotic Surgery Upgrade at JPS Arlington Requires 7 Low Voltage Systems
JPS Health Network''s $400,000 robotic surgery upgrade at its Arlington Surgical Center requires seven low voltage systems — from DAS and nurse call to CCTV and fire alarm — creating a dense LV opportunity in the heart of Tarrant County''s $2.5 billion public healthcare expansion.
Apr 8, 2026
$749K Cath Lab Remodel at Children's Minnesota Needs 7 Low Voltage Systems
A $749,000 cardiac catheterization lab remodel at Children''s Minnesota in Minneapolis requires seven low voltage systems including DAS, nurse call, and structured cabling. The estimated LV contract value is approximately $90,000, with Knutson Construction as GC and Pope Design Group as architect.
Apr 8, 2026
LVN Signal Now Tracks Tucson, Arizona: Real-Time Construction Intelligence for Low Voltage Contractors
Tucson, Arizona is now live on LVN Signal. Low voltage contractors working in the Tucson metro area now have access to real-time construction intelligence covering 310+ active projects with 52 new permits added this week.
Apr 7, 2026
Piedmont Atlanta Hospital $20.4M Alteration Demands 6 Low-Voltage Systems
A $20.4 million hospital alteration at Piedmont Atlanta Hospital requires six low-voltage systems including structured cabling, access control, CCTV, nurse call, fire alarm, and DAS. Estimated LV value: $1.52 million.
Apr 6, 2026
LVN Signal Now Tracks Rochester, New York: Real-Time Construction Intelligence for Low Voltage Contractors
Rochester, New York is now live on LVN Signal. Low voltage contractors working in the Rochester metro area have access to real-time construction intelligence covering 330+ active projects — with 97 new permits added this week.
Apr 6, 2026