Jobs & Projects
Permits

Security Camera Permit Requirements in Portland, Oregon

January 20, 2026
04:00 PM

Join Low Voltage Nation — Find project opportunities and showcase your company to thousands of industry professionals

Security camera permit requirements for Portland, Oregon. Learn about CCB licensing, Portland Development Services permits, fees, and installation guidelines.

Security Camera Permit Requirements in Portland, Oregon

Installing security cameras in Portland requires understanding Oregon's contractor licensing requirements and Portland's permitting process. The city uses the Permits Online system for permit applications, and all contractors must hold valid CCB (Construction Contractors Board) licenses. Here's what low voltage contractors need to know.

Quick Answer: Do You Need a Permit?

Generally no for cameras alone. Standalone security camera installations typically don't require permits in Portland. However, permits may be required when camera work involves electrical modifications, structural mounting, or is part of a larger construction project.

When Are Security Camera Permits Required?

Portland requires permits when security camera work involves:

  • New electrical circuits for camera power
  • Structural modifications for pole or wall mounts
  • Trenching for underground conduit runs
  • Work included in broader building permits
  • Commercial construction or tenant improvement projects

Work that typically does NOT require permits:

  • IP cameras using existing network infrastructure
  • PoE cameras on existing data drops
  • Wireless camera systems
  • Surface-mounted cameras with standard brackets
  • Camera software and NVR configuration

What Licenses Do You Need in Oregon?

Oregon requires CCB licensing for low voltage contractors:

  • CCB License Required: All contractors performing low voltage work must hold a valid Construction Contractors Board license
  • Limited Energy (LE) License: Required for low voltage and communications work
  • Portland Business License: Required to operate in the city
  • Bonding and Insurance: CCB requires proof of bond and insurance

For complete state licensing details, see our Oregon Low Voltage Contractor License Guide.

How Do You Apply for Permits When Required?

When your project requires permits:

  1. Register Online: Create account at Portland Development Services
  2. Verify CCB License: Your CCB license must be valid and on file
  3. Submit Application: Use Portland's Permits Online system
  4. Provide Documentation:
    • Site plan showing camera locations
    • Electrical load calculations (if new circuits)
    • Mounting details for structural attachments
  5. Pay Fees and Schedule Inspections

Contact Information

Portland Bureau of Development Services
1900 SW Fourth Ave
Portland, OR 97201
Phone: (503) 823-7300
Hours: Monday-Friday 8am-5pm
Website: portland.gov/bds

What Are Typical Permit Fees?

Permit Type Fee Range
Limited Energy/Low Voltage $80 - $150
Electrical Permit $100 - $250
Plan Review (if required) Additional 65% of permit fee

How Long Does the Process Take?

Scenario Timeline
No Permit Required Start immediately
Simple Limited Energy Permit 1-3 business days
Electrical Permit 3-5 business days
Commercial with Plan Review 2-4 weeks

Residential vs Commercial Requirements

Residential Security Cameras

Home camera installations in Portland are straightforward:

  • No permits for most installations
  • Use existing electrical outlets or PoE
  • Oregon law allows recording on your own property
  • Consider neighbor privacy when positioning outdoor cameras
  • HOA rules may apply in some developments

Commercial Security Cameras

Commercial projects have additional considerations:

  • CCB license verification required for permit system
  • Coordinate with property management
  • May require electrical permits for dedicated circuits
  • Consider integration with access control and fire systems
  • Employee notification requirements under Oregon law

Oregon Security Camera Laws

Oregon has specific laws governing surveillance:

  • One-Party Consent: Oregon is a one-party consent state for audio recording
  • Private Property: You can record on your own property
  • Workplace: Employers must notify employees about video surveillance
  • Audio: Recording private conversations without consent may violate Oregon law

Pro Tips from Experienced Contractors

  • CCB License First: Your CCB license must be active before using Portland's permit system
  • PoE Simplifies Permits: Using PoE cameras avoids electrical permit requirements
  • Check Building Age: Older Portland buildings may have historic preservation requirements
  • Document Locations: Provide clients with as-built drawings showing camera positions
  • Employee Notice: For commercial jobs, ensure client understands Oregon's workplace surveillance notification requirements

Stay Ahead of Permit Activity

Want to know when security camera projects hit permits in Portland before they reach bid boards?

LVN Signal monitors permit activity across Oregon and alerts you to opportunities the moment they're filed.

→ Explore LVN Signal

Related Permit Guides for Portland

Additional Resources

Tags

#permits
#oregon
#security-camera
#licensing
#portland

Join 35,000+ Low Voltage Pros

Get weekly permit updates, tool deals, job opportunities, and industry news. No spam, unsubscribe anytime.