Join Low Voltage Nation — Find project opportunities and showcase your company to thousands of industry professionals
Learn More →
James Masters CNCI, ECSE-D | Servcomp
@James Masters
Posted on linkedin
149
18
0Gallery
Phase 1 of tidying up comms cabinets at a school in London, which we carried out earlier this year.
Starting with the server comms room pictured. We stripped out all the panels, then installed new basket containment to support the cable drops into the cabinet.
New Meraki switches were installed along with a new UPS and power distribution units. New cables for the various servers and storage devices were made and dressed in along with labeling.
#structured cabling·#cable management·#data cabinet·#data cabling
Join 35,000+ Low Voltage Pros
Get weekly permit updates, tool deals, job opportunities, and industry news. No spam, unsubscribe anytime.