Fire Alarm Permit Requirements in Gresham, Oregon
Join Low Voltage Nation — Find project opportunities and showcase your company to thousands of industry professionals
Complete guide to fire alarm permit requirements in Gresham, Oregon. Learn about GFD plan review, PE stamp requirements, electronic submittal, and NFPA 72 compliance.
Fire Alarm Permit Requirements in Gresham, Oregon
Installing fire alarm systems in Gresham requires coordination with both the Building Department and Gresham Fire Department (GFD). The city has specific plan submittal requirements and follows the Oregon Fire Code. This guide covers everything contractors need to know about permits and compliance in Oregon's fourth-largest city.
Quick Answer: Do You Need a Permit?
Yes, fire alarm installations require permits. Installation, alterations, or modifications to fire alarm systems may only be done under benefit of permit from local building permit services. Permits are also required for replacement of any Fire Alarm Control Panel (FACP). Stamped approved drawings must be on-site during all work and inspections.
What Is a Fire Alarm System?
Fire alarm systems requiring permits in Gresham include:
- Conventional and addressable fire alarm panels
- Smoke and heat detectors
- Manual pull stations
- Notification appliances (horns, strobes, speakers)
- Duct smoke detectors
- Fire alarm monitoring connections
- Tamper switches for sprinkler system valves
- Mass notification systems
When Are Permits Required in Gresham?
GFD and Gresham Building Services require permits for:
Permit Required
- New fire alarm system installations
- Replacement of Fire Alarm Control Panels (FACP)
- Adding devices to existing systems
- System alterations or modifications
- Tenant improvement projects affecting fire alarm
- Duct smoke detector installations
May Be Exempt
- Battery replacements
- Minor repairs and maintenance
- Annual testing (no modifications)
Contact GFD Fire Marshal's Office at (503) 618-2355 to confirm requirements.
Oregon Contractor Licensing Requirements
Fire alarm contractors in Gresham must hold multiple credentials.
Required Licenses
- CCB License - Oregon Construction Contractors Board registration
- Limited Energy (LE) Endorsement - Required for low-voltage systems
- OSFM Fire Alarm License - Oregon State Fire Marshal certification
- PE Stamp - Plans must be stamped by Oregon Registered Professional Engineer or Architect (per ORS 671.020) unless exempt under OARS 918-261-0015
For complete licensing details, see our Oregon Low Voltage Contractor License Guide.
How to Apply for Fire Alarm Permits in Gresham
Step 1: Prepare Documentation
Fire alarm permit applications require:
- PE-stamped fire alarm system drawings (unless exempt)
- Device layout and floor plans
- Riser diagrams showing system architecture
- Equipment cut sheets and specifications
- Battery calculations and voltage drop analysis
- Sequence of operations
- CCB and fire alarm license numbers
Step 2: Electronic Plan Submittal
Gresham currently requires electronic plan submittal and review for fire alarm systems.
City of Gresham Building Services
1333 NW Eastman Parkway
Gresham, OR 97030
Phone: (503) 618-2845
Online: greshamoregon.gov/Building-and-Permits
GFD Fire Marshal's Office
Phone: (503) 618-2355
Step 3: Plan Review
GFD reviews fire alarm plans for compliance with:
- 2022 Oregon Fire Code (OFC)
- NFPA 72 (2019 edition) - National Fire Alarm Code
- Local amendments and requirements
Step 4: Schedule Inspections
After permit approval and installation:
- Rough-in inspection - Wiring, conduit, and device boxes before concealment
- Final inspection - Complete system testing with GFD
Important: Stamped APPROVED drawings must always be on-site when work is performed and available during inspections.
What Are the Fees for Fire Alarm Permits?
| Permit Type | Fee Range | Notes |
|---|---|---|
| Fire Alarm Permit | $150-$500+ | Based on system size |
| Plan Review | 65% of permit fee | Required for all fire alarm |
| Re-inspection | $75-$100 | Per failed inspection |
Contact GFD or Building Services for current fee schedules.
How Long Does the Permit Process Take?
| Phase | Timeline |
|---|---|
| Electronic submittal | Same day |
| Plan review (simple systems) | 1-2 weeks |
| Plan review (complex commercial) | 2-3 weeks |
| Permit issuance | 1-2 days after approval |
| Inspection scheduling | 48-72 hours notice |
Special Technical Requirements
Tamper Switches
PIV and control valves in fire vaults must have tamper switches tied to building FACP.
Duct Smoke Detectors
If duct detection is required without a fire alarm system on site:
- Must activate visible/audible signaling device in approved location
- Permanent sign required stating "DUCT SMOKE DETECTOR TROUBLE ALARM"
- Strobe shall not be fire alarm style with red body
- Specific appliances made for this application must be used
- Appliance must be approved by GFD prior to installation
Annual Maintenance Requirements
Businesses with fire alarm systems must:
- Have systems tested and maintained annually
- Notify monitoring agencies before testing to prevent false alarms
- Use qualified companies for maintenance
- Forward service checklists to Fire Department for review
Fire Watch Requirements
When fire alarm, detection, or suppression systems are out-of-service and hazards are present:
- Fire code official and/or property owner must initiate fire watch
- Continuous systematic surveillance required
- Qualified individuals must identify hazards and detect early fire signs
- Responsible for raising alarm and notifying fire department
Pro Tips from Experienced Contractors
- Electronic submittal required - Gresham requires electronic plan submittal
- PE stamp usually required - Check OARS 918-261-0015 for exemptions
- Keep approved drawings on site - Required during all work and inspections
- Pre-approve special devices - Duct detector appliances need GFD approval first
- Annual service reports - Use GFD's annual fire alarm service report form
- Coordinate monitoring - Notify alarm company before testing
Stay Ahead of Permit Activity
Want to know when fire alarm projects hit permits in Gresham before they reach bid boards?
LVN Signal monitors permit activity across Oregon and alerts you to opportunities the moment they're filed.
Related Permit Guides for Gresham
Additional Resources
Tags
Join 35,000+ Low Voltage Pros
Get weekly permit updates, tool deals, job opportunities, and industry news. No spam, unsubscribe anytime.