Complete guide to fire alarm permits in Fulton County, Georgia. Covers Georgia LVA licensing, NICET certification, NFPA 72 compliance, Fire Marshal plan review, and municipal jurisdiction contacts.
Fire Alarm Permit Requirements in Fulton County, Georgia
Quick Answer: Fulton County requires permits for fire alarm system installations, with plans reviewed by the Fire Marshal. Contractors must hold a Georgia Low Voltage Contractor license (LVA or LVU) and NICET certification is typically required for commercial projects. Systems must comply with NFPA 72 and the Georgia State Minimum Fire Safety Standards.
When Are Permits Required for Fire Alarms in Fulton County?
Fire alarm installations in Fulton County require permits due to life safety implications. The Fire Marshal reviews all fire alarm plans to ensure compliance with Georgia fire codes.
Projects Requiring Permits
- New fire alarm systems: Complete system installations in commercial, industrial, or multi-family buildings
- System replacements: Replacing existing fire alarm control panels or major components
- System expansions: Adding detection devices, notification appliances, or zones
- Tenant improvements: Fire alarm modifications for new tenant buildouts
- Change of occupancy: Buildings changing use that affect fire alarm requirements
- Retrofits: Adding fire alarm systems to existing buildings
Potentially Exempt Work
- Like-for-like device replacements (same type and location)
- Battery replacements
- Minor repairs not affecting system design
- Residential smoke detector replacements in single-family homes
Important: Fulton County includes multiple municipalities. Each city (Atlanta, Sandy Springs, Roswell, Alpharetta, Johns Creek, South Fulton, Milton) has its own Fire Marshal office. This guide covers unincorporated Fulton County. Verify jurisdiction before starting any project.
Georgia Fire Alarm Codes and Standards
Fulton County enforces the Georgia State Minimum Fire Safety Standards, which include:
Applicable Codes
- NFPA 72: National Fire Alarm and Signaling Code (primary installation standard)
- International Fire Code: With Georgia amendments
- NFPA 101: Life Safety Code
- Georgia Rules 120-3-3: State Minimum Fire Safety Standards
Key Technical Requirements
| Requirement | Standard | Notes |
|---|---|---|
| Power Supply | Building electrical with 24-hour standby | 1.5 hour minimum for systems after April 1992 |
| Detector Installation | NFPA 72 spacing and placement | Listed devices required |
| Notification Appliances | NFPA 72 audibility and visibility | ADA compliance required |
| Monitoring | UL-listed central station | Required for most commercial occupancies |
| Interconnection | Corridor smoke detectors to FACP | Required per Georgia code |
Contractor Licensing Requirements
Georgia requires proper licensing for fire alarm work under O.C.G.A. 43-14.
Georgia Low Voltage License
| License Type | Code | Fire Alarm Work |
|---|---|---|
| Unrestricted | LVU | All fire alarm work permitted |
| Alarm | LVA | Fire alarm systems permitted |
| General | LVG | Not permitted for fire alarms |
| Telecommunications | LVT | Not permitted for fire alarms |
NICET Certification Requirements
While Georgia does not mandate NICET certification statewide, most jurisdictions including Fulton County require or strongly prefer NICET-certified technicians:
- Plan submittals: Often require NICET-certified designer
- On-site supervision: NICET-certified technician typically required on job site
- Inspection and testing: NICET certification expected for acceptance testing
- Company requirement: Many jurisdictions require at least one NICET Level III or IV on staff
NICET Fire Alarm Certification Levels
| Level | Typical Responsibilities |
|---|---|
| Level I | Entry-level installation work under supervision |
| Level II | Installation, basic troubleshooting, limited design |
| Level III | System design, project management, plan review |
| Level IV | Complex system design, code consultation, expert witness |
For detailed licensing information, see our Georgia Low Voltage Contractor License Guide.
Fulton County Permit Process
Step 1: Plan Preparation
Prepare complete fire alarm plans including:
- Floor plans showing all device locations
- Riser diagrams
- Equipment specifications and cut sheets
- Battery calculations
- Voltage drop calculations
- Notification appliance circuit calculations
- Sequence of operations
- Point-to-point wiring diagrams
Step 2: Submit for Review
Submit plans to the appropriate authority:
- Unincorporated Fulton County: Fulton County Public Works
- State buildings: Georgia Office of Commissioner of Insurance and Safety Fire
- Municipalities: Contact local Fire Marshal office
Step 3: Plan Review
The Fire Marshal reviews plans for code compliance. Common review items include:
- Device spacing and coverage
- Notification appliance placement and coverage
- Power supply adequacy
- Monitoring requirements
- Integration with other building systems
- Emergency voice/alarm communication (if required)
Step 4: Obtain Permit
Once plans are approved, obtain the fire alarm permit before beginning installation.
Step 5: Installation and Inspection
Schedule inspections at required phases:
- Rough-in inspection: Before concealing wiring
- Final inspection: System complete and operational
- Acceptance testing: Witnessed functional testing per NFPA 72
Inspection and Testing Requirements
Acceptance Testing
New fire alarm systems require comprehensive acceptance testing per NFPA 72 Chapter 14:
- 100% device testing
- All initiating devices verified
- All notification appliances verified
- Sequence of operations confirmed
- Central station communication tested
- Secondary power tested
- Documentation provided to owner
Annual Inspections
Fire alarm systems require ongoing inspection and testing:
- Visual inspection: Monthly by owner, annually by qualified technician
- Functional testing: Per NFPA 72 Table 14.4.3.2
- Sensitivity testing: Smoke detectors within first year, then every alternate year
- Documentation maintained on-site
Municipal Fire Marshal Contacts
Fire alarm permits in Fulton County municipalities are handled by local Fire Marshal offices:
| Municipality | Contact |
|---|---|
| Atlanta | Atlanta Fire Marshal |
| South Fulton | South Fulton Fire Marshal |
| Roswell | Roswell Fire Marshal |
| Alpharetta | Alpharetta Fire Inspections |
| Sandy Springs | Contact City Fire Department |
| Johns Creek | Contact City Fire Department |
Georgia State Fire Marshal
Office of Insurance and Safety Fire Commissioner
Fees and Timeline
| Item | Typical Range | Notes |
|---|---|---|
| Plan Review | Varies by project size | Based on system complexity |
| Fire Alarm Permit | Varies by valuation | Percentage of project value |
| Inspection Fees | Included or separate | Varies by jurisdiction |
| Re-inspection | Additional fee | If initial inspection fails |
Timeline: Plan review typically takes 2-4 weeks depending on project complexity and jurisdiction backlog.
Residential vs. Commercial Requirements
Residential Fire Alarms
- Single-family homes require smoke alarms per Georgia Code 25-2-40
- Interconnected smoke alarms required in new construction
- Battery backup required
- Permits generally not required for smoke alarm installation
- Multi-family buildings (3+ units) require commercial-grade systems
Commercial Fire Alarms
- Permits required for all new systems and modifications
- Plans must be prepared by qualified designer
- NICET certification typically required
- Central station monitoring required for most occupancies
- Annual inspection and testing required
- Fire watch required during system impairments
Pro Tips from Georgia Fire Alarm Contractors
- Verify AHJ early: Confirm which Fire Marshal has jurisdiction before starting design
- Pre-application meeting: Complex projects benefit from early coordination with the Fire Marshal
- Complete submittals: Incomplete plans cause delays - include all required calculations and specs
- Coordinate early: Fire alarm often interfaces with HVAC, elevators, and access control - coordinate early
- Document everything: Maintain comprehensive as-built drawings and test records
- Train building staff: Provide thorough training on system operation and maintenance
- Plan for testing: Schedule acceptance testing when building is ready for occupancy
Stay Ahead of Permit Activity
Want to know when fire alarm projects hit permits in Fulton County before they reach bid boards?
LVN Signal monitors permit activity across Georgia and alerts you to opportunities the moment they are filed.
Related Permit Guides
Tags
Join 35,000+ Low Voltage Pros
Get weekly permit updates, tool deals, job opportunities, and industry news. No spam, unsubscribe anytime.