Access Control Permit Requirements in Charleston, South Carolina

January 20, 2026
04:00 PM

Join Low Voltage Nation — Find project opportunities and showcase your company to thousands of industry professionals

Complete guide to access control permit requirements in Charleston, South Carolina. Learn about low voltage permits, licensing exemptions, and historic district considerations.

Access Control Permit Requirements in Charleston, South Carolina

Installing access control systems in Charleston, South Carolina? Understanding permit requirements and the unique licensing landscape helps contractors and property owners navigate compliance. Notably, South Carolina has different requirements for access control versus alarm systems.

Quick Answer: Do You Need a Permit?

It depends on the scope of work. Basic access control installations using low voltage wiring typically require a Low Voltage (commercial only) electrical permit for commercial projects in Charleston. Work involving new electrical circuits, door hardware modifications, or fire alarm integration will require additional permits. Importantly, South Carolina's Alarm Systems Business Act explicitly excludes "card access" systems from its licensing requirements.

When Are Permits Required for Access Control?

Permits Usually Required:

  • Commercial low voltage installations – Charleston requires Low Voltage electrical permits for commercial work
  • New electrical circuits – Adding dedicated power for access control panels
  • Door frame modifications – Cutting or modifying frames for electric strikes
  • Fire alarm integration – Access control tied to fire systems requires fire permits
  • Automatic door openers – May require building permits for ADA compliance
  • Historic district installations – May require additional review

Permits Usually NOT Required:

  • Standalone card readers – Low voltage devices using existing power
  • Keypad locks – Battery-powered electronic locks
  • Wireless access control – No new wiring required
  • Device replacements – Like-for-like swaps
  • Residential installations – Most residential access control is exempt

What Contractor License Do You Need?

Important distinction: South Carolina Code explicitly states that the Alarm Systems Business Act does not apply to "camera, card access, or walk-through alarm systems." This means access control systems have different licensing requirements than burglar or fire alarms.

Access Control Licensing Options:

Option 1: General Contractor with Low Voltage Experience

  • Business registration with SC Secretary of State
  • General liability insurance
  • Local business license
  • May be sufficient for standalone access control

Option 2: Burglar Alarm License (If Integrated with Alarm)

If access control is integrated with a monitored alarm system, the Burglar Alarm license may apply:

  • NTS Level I or II certification
  • SC Business and Law exam plus Burglar Alarm exam
  • $100,000 liability insurance minimum
  • Criminal background check

Option 3: Electrical Contractor License

For work involving electrical modifications beyond low voltage:

  • SC Electrical Contractor license
  • Required if installing new circuits or high-voltage components

For complete licensing details, see our South Carolina Low Voltage License Guide.

How Do You Apply for Permits in Charleston?

City of Charleston Permit Center

Application Process:

  1. Verify jurisdiction – Use gis.charleston-sc.gov to confirm your project is within city limits
  2. Determine permit type – Contact Permit Center if unclear whether Low Voltage electrical permit applies
  3. Prepare documentation – Site plans, equipment specifications, wiring diagrams
  4. Submit application – Email to permits@charleston-sc.gov (PDF format only)
  5. Pay fees – Based on project scope
  6. Schedule inspection – Required for permitted work

Electrical Permit Application:

Download the Electrical Trade Permit Application which includes "Low Voltage (commercial only)" category.

What Are the Fees and Processing Times?

Permit Type Typical Fee Range Processing Time
Low Voltage Electrical (Commercial) $50-$150 1-2 weeks
Building Permit (door mods) Based on valuation 1-2 weeks
Fire Alarm Integration Separate fire permit required Varies by project level

Contact Permit Center for exact fees.

What's the Difference Between Residential and Commercial?

Residential Installations:

  • Generally no permit required for standalone systems
  • Smart locks and wireless systems typically exempt
  • Homeowner can self-install on own property
  • No special contractor license typically required

Commercial Installations:

  • Low Voltage electrical permit often required
  • Licensed contractor recommended
  • Insurance requirements for commercial work
  • Fire alarm integration requires fire permits
  • Historic district may add requirements
  • ADA compliance for door hardware

Access Control System Considerations

System Type Permit Considerations License Notes
Card/Fob Readers Low voltage permit if commercial Exempt from Alarm Act
Biometric Systems Same as card readers Exempt from Alarm Act
Electric Strikes May need building permit for frame mods Check local requirements
Magnetic Locks Low voltage, fire alarm tie-in required Fire permit if egress door
Integrated with Alarm Alarm permit requirements apply May need Burglar Alarm license

Historic District Considerations

Charleston's historic district has additional requirements for exterior modifications:

  • Board of Architectural Review (BAR) – May need approval for visible equipment
  • Aesthetic requirements – Equipment may need to blend with building
  • Mounting restrictions – Historic structures may have drilling limitations
  • Contact Planning & Zoning – Verify requirements before installation

Pro Tips from Experienced Contractors

  • Know the exemption – SC Code exempts "card access" from Alarm Act. This gives access control installers more flexibility than alarm contractors.
  • Watch the integration line – If access control interfaces with a monitored alarm system, alarm licensing may apply to the integrated system.
  • Fire alarm tie-in is critical – Mag locks on egress doors must release on fire alarm. This often requires fire alarm permits even for access control projects.
  • PDF only for permits – Charleston only accepts PDF format. Don't submit other file types.
  • Verify jurisdiction – Charleston's boundaries are complex. Use the GIS map before submitting.
  • Historic district adds time – If working in historic areas, build in extra time for BAR review.
  • ADA matters – Commercial access control must comply with ADA door hardware height and operation requirements.

Stay Ahead of Permit Activity

Want to know when access control projects hit permits in Charleston before they reach bid boards?

LVN Signal monitors permit activity across South Carolina and alerts you to opportunities the moment they're filed.

→ Explore LVN Signal

Related Permit Guides for Charleston

For state-level licensing information, see our South Carolina Low Voltage License Guide.

Tags

#permits
#south-carolina
#access-control
#charleston
#licensing