Jobs & Projects
Permits

Fire Alarm Permit Requirements in Charleston, South Carolina

January 20, 2026
04:00 PM

Join Low Voltage Nation — Find project opportunities and showcase your company to thousands of industry professionals

Complete guide to fire alarm permit requirements in Charleston, South Carolina. Learn about Fire Marshal permits, inspection requirements, and SC contractor licensing.

Fire Alarm Permit Requirements in Charleston, South Carolina

Installing fire alarm systems in Charleston, South Carolina requires permits through the Fire Marshal Division and proper state licensing. This guide covers what contractors and property owners need to know about compliance, inspections, and licensing requirements.

Quick Answer: Do You Need a Permit?

Yes, fire alarm installations require permits in Charleston. The Charleston Fire Department Fire Marshal Division reviews plans and issues permits for fire alarm work. Multiple inspections are required throughout the project, including rough-in, overhead, and final inspections. South Carolina law requires contractors to be licensed through the SC Contractor's Licensing Board.

When Are Fire Alarm Permits Required?

Permits Always Required:

  • New fire alarm system installations – Commercial and multi-family
  • System modifications – Adding devices, zones, or expanding coverage
  • System replacements – Upgrading existing fire alarm panels
  • Tenant improvements – Fire alarm work as part of buildouts
  • Change of occupancy – When fire alarm requirements change

May Not Require Permits:

  • Single/two-family homes – Residential smoke detector installation
  • Like-for-like device replacements – Same type, same location
  • Annual testing and maintenance – Routine inspections

What Contractor License Do You Need?

Critical requirement: South Carolina law makes it unlawful to practice in the alarm system business without being licensed per the SC Alarm Systems Business Act.

Fire Alarm Contractor License:

The SC Contractor's Licensing Board issues Fire Alarm licenses. Requirements include:

Certification (One Required):

  • NTS Level I or II – National Training School certification, OR
  • NICET Level II or III – Fire Alarm Systems certification

Examination Requirements:

  • Alarm Code of Laws Exam – SC-specific business and law
  • Fire Alarm Technical Exam – 50 questions, open-book, 3 hours, 35 correct to pass
  • Exam fee: $60 (administered by PSI)

Application Requirements:

  • Initial Application Doc #130
  • PSI exam score sheets
  • NTS or NICET certificate
  • Criminal background check for all principal officers
  • Certificate of Liability Insurance ($100,000 minimum)
  • $200 license fee payable to SCCLB

Qualifying Party:

Must designate a Primary Qualifying Party who is an owner, partner, officer, or full-time employee in a management position.

For complete licensing details, see our South Carolina Low Voltage License Guide.

How Do You Apply for Fire Alarm Permits in Charleston?

Step 1: Verify Jurisdiction

Charleston includes areas like West Ashley, James Island, Johns Island, and Cainhoy with mixed incorporation. Verify your project location at gis.charleston-sc.gov.

Step 2: Download Correct Application

  • Projects initiated before 12/31/2022: Use 2018 application
  • Projects initiated after 1/1/2023: Use 2021 application
  • Fire Alarm Permit Application: Download from charleston-sc.gov

Step 3: Prepare Submittal Package

Contractors must provide:

  • Completed permit application
  • Stamped drawings
  • System manual(s)
  • Equipment specifications

Step 4: Submit for Review

Plans are assigned to one of five review levels based on project type and size, each with projected review times.

Charleston Fire Marshal Division Contact:

What Inspections Are Required?

Charleston requires minimum three inspections during fire alarm projects:

Inspection When Required What's Checked
Rough-In Before wiring is concealed Wiring methods, conduit, boxes
Overhead Before ceiling tiles installed Above-ceiling devices, wiring
Final System complete Device placement, functional test, response time

Record of Completion:

Upon final inspection, contractor must provide:

  • Record of Completion attesting to proper installation
  • Copy to building owner
  • Copy to inspector
  • Submittal package and Record of Completion in labeled binder at fire alarm panel ("Fire Alarm Plans – Do Not Remove From Site")

What Are the Fees and Processing Times?

Item Fee/Timeline
Fire Alarm Permit Based on project scope
Plan Review Varies by project level (1-5)
Permit Validity 2 years from issuance
Work Stoppage Expiration 6 months of inactivity

Contact Fire Marshal Division for specific fee schedules.

What Are the Code Requirements?

Applicable Codes:

  • NFPA 72 – National Fire Alarm and Signaling Code
  • South Carolina Building Code
  • Charleston Fire Code (Chapter 13)

Contractor Responsibilities:

Per Charleston requirements, contractors must have "thorough working knowledge of the applicable ordinances, codes, and standards." This includes:

  • Device placement per NFPA 72
  • Proper wiring methods
  • System programming
  • Central station connection requirements
  • Testing protocols

What's the Difference Between Residential and Commercial?

Residential (1-2 Family):

  • Smoke detectors may be homeowner-installed
  • Permits typically not required for basic smoke alarms
  • Interconnected systems in new construction

Commercial and Multi-Family:

  • Fire Alarm contractor license required
  • Permit and plan review mandatory
  • Three-phase inspection process
  • Record of Completion documentation
  • Central station monitoring often required

Pro Tips from Experienced Contractors

  • Get NICET or NTS certified first – You cannot take the SC exam without one of these certifications.
  • Verify jurisdiction – Charleston's boundaries are complex. Use the GIS map before submitting to the wrong authority.
  • Use correct application version – Projects after 1/1/2023 require the 2021 application. Using the wrong form delays review.
  • Schedule inspections proactively – Rough-in must happen before concealment. Don't let drywallers close up walls before inspection.
  • Keep documentation at the panel – Charleston requires plans to remain on-site in a labeled binder. Include this in your closeout process.
  • Watch the 6-month clock – Permits expire if work stops for 6 months. Keep projects moving or communicate with the Fire Marshal.
  • No CE requirements yet – SC currently has no continuing education for alarm licenses, but stay current on code changes anyway.

Stay Ahead of Permit Activity

Want to know when fire alarm projects hit permits in Charleston before they reach bid boards?

LVN Signal monitors permit activity across South Carolina and alerts you to opportunities the moment they're filed.

→ Explore LVN Signal

Related Permit Guides for Charleston

For state-level licensing information, see our South Carolina Low Voltage License Guide.

Tags

#permits
#south-carolina
#fire-alarm
#charleston
#licensing

Join 35,000+ Low Voltage Pros

Get weekly permit updates, tool deals, job opportunities, and industry news. No spam, unsubscribe anytime.