Complete guide to structured cabling permit requirements in San Bernardino County, CA. Learn about C-7 licensing, building permits, code requirements, and fees.
Structured Cabling Permit Requirements in San Bernardino County, California
Quick Answer: Structured cabling installations in San Bernardino County may require permits depending on project scope. The county enforces California Building, Electrical, and Energy Codes per Title 24. Contractors must hold a California C-7 Low Voltage Systems Contractor license for data network installations. Permits are submitted through the EZOP Online Permitting Portal.
When Are Structured Cabling Permits Required?
San Bernardino County Building and Safety enforces California codes for construction work. Permits are typically required for:
- Commercial network infrastructure installations
- New construction data cabling rough-in
- Significant tenant improvement cabling projects
- Fiber optic backbone installations
- Data center build-outs
- Projects involving fire-rated assembly penetrations
- Work requiring structural modifications
Permit Exemptions
Many low-voltage cabling projects may be exempt from permits:
- Workstation cable drops in existing commercial spaces
- Patch panel and switch connections
- Cable testing and certification
- Wireless access point installations (no penetrations)
- Small residential network installations
- Minor maintenance and repairs
Always verify with San Bernardino County Building and Safety before proceeding without permits.
Contractor Licensing Requirements
California requires specific licensing for structured cabling work through the Contractors State License Board (CSLB):
C-7 Low Voltage Systems Contractor License
The C-7 license is required for installing communication and low voltage systems not exceeding 91 volts:
- Structured cabling and data networking systems
- Telephone and communication systems
- Audio and video systems
- CCTV and surveillance systems
- Cable television and satellite installations
C-7 License Requirements
- Experience: Four years of journey-level experience within the past 10 years
- Exams: Pass both C-7 Trade Exam and Law and Business Exam
- Background check: Live Scan fingerprinting required
- Bond: Contractor's bond required
- Application fee: $450 plus initial license fee
Note: Fire alarm systems are excluded from C-7 and require C-10 licensing.
For complete California licensing requirements, see our California Low Voltage Contractor License Guide.
Permit Application Process
Step 1: Determine Permit Requirements
Contact San Bernardino County Building and Safety to confirm whether your project requires:
- Low-voltage permit
- Electrical permit
- Building permit (for significant construction)
Step 2: Prepare Documentation
For projects requiring permits, prepare:
- Floor plans showing cable pathway routes
- Riser diagrams for multi-floor installations
- Telecommunications room layouts
- Cable specifications (Cat6, Cat6A, fiber type)
- Fire-stopping details for penetrations
- Energy calculations if required by Title 24
Step 3: Submit Through EZOP Portal
San Bernardino County uses the EZOP Online Permitting Portal:
- Create account or log in
- Select appropriate permit type
- Upload documentation as PDF
- Pay applicable fees
Step 4: Plan Review
Building and Safety reviews plans for compliance with:
- California Electrical Code
- NEC Article 800 (Communications Circuits)
- Title 24 energy requirements
- Fire-stopping requirements
Step 5: Permit Issuance and Inspection
Once approved, print permit and schedule inspections as required.
Contact Information
| Contact | Details |
|---|---|
| Department | San Bernardino County Land Use Services - Building and Safety |
| EZOP Portal | wp.sbcounty.gov/ezop/permits |
| Website | lus.sbcounty.gov |
| Main Office | 385 N. Arrowhead Ave., San Bernardino, CA 92415 |
| High Desert Office | 15900 Smoke Tree St., Suite 131, Hesperia, CA 92345 |
CSLB Licensing Contact
| Contact | Details |
|---|---|
| Agency | California Contractors State License Board |
| Website | cslb.ca.gov |
| C-7 Classification | Low Voltage Systems Contractor |
Fees and Timeline
| Service | Fee Range | Timeline |
|---|---|---|
| Low-Voltage Permit | $50-$200+ | Based on project scope |
| Plan Review | Included or additional | 5-15 business days |
| Inspection | Included | Schedule after installation |
| C-7 License Application | $450 | Processing varies |
| C-7 Initial License Fee | $200-$350 | Upon approval |
Permit fees based on valuation and size. Additional school, traffic, drainage, SMIP, and tech surcharge fees may apply. Contact Building and Safety for fee quotes.
Code Requirements
California Electrical Code Compliance
All low voltage wiring must comply with NEC and California codes:
- NEC Article 800: Communications circuits installation standards
- Plenum ratings: Use CMP-rated cable in air handling spaces
- Fire-stopping: Seal all penetrations through fire-rated assemblies
- Separation: Maintain proper separation from power conductors
- Grounding: Follow NEC Article 800.100 for grounding requirements
Title 24 Compliance
Larger projects may require energy calculations and compliance with California's Title 24 energy standards.
Residential vs Commercial Requirements
Residential Projects
- Single-family homes: typically permit-exempt for basic network cabling
- Multi-family (MDU): may require permits for riser installations
- Home offices: usually exempt unless significant construction involved
- Smart home systems: verify requirements based on scope
Commercial Projects
- New construction: permits required for infrastructure rough-in
- Tenant improvements: depends on scope and penetrations
- Data centers: full permit and inspection process required
- Healthcare facilities: additional compliance requirements
- Educational facilities: often require full permitting
Pro Tips from Contractors
- Verify with Building and Safety: Low-voltage requirements can vary by project type and location
- Use EZOP portal: Online submission streamlines the process
- Plenum vs riser: Know when CMP-rated cable is required vs CMR-rated
- Fire-stopping: Use listed fire-stop systems and keep documentation
- Title 24: Check if energy compliance documentation is required
- Multiple offices: Choose the Building and Safety office closest to your project
- Fee quotes: Request fee quotes before submitting to understand total costs
- BICSI standards: Follow BICSI TDMM guidelines for best practices
Stay Ahead of Permit Activity
Want to know when structured cabling projects hit permits in San Bernardino County before they reach bid boards?
LVN Signal monitors permit activity across California and alerts you to opportunities the moment they are filed.
Related Guides
Tags
Join 35,000+ Low Voltage Pros
Get weekly permit updates, tool deals, job opportunities, and industry news. No spam, unsubscribe anytime.