Fire Alarm Permit Requirements in Plano, Texas

January 24, 2026

Join Low Voltage Nation — Find project opportunities and showcase your company to thousands of industry professionals

Complete guide to fire alarm permit requirements in Plano, Texas. SFMO licensing required. 2024 IFC adopted August 1. Fire Marshal plan review process.

# Fire Alarm Permit Requirements in Plano, Texas **Quick Answer:** Fire alarm installations in Plano, Texas require permits from the Plano Fire Marshal's Office. Contractors must hold a Texas State Fire Marshal Office (SFMO) fire alarm license. Plano adopted 2024 International Fire Code effective August 1, 2024. ## Do I Need a Permit for Fire Alarm Work in Plano? Yes. Plano requires fire alarm permits for: - **New fire alarm installations** - All occupancies - **System modifications** - Adding or relocating devices - **Panel replacements** - Including upgrades - **Annunciator installations** - Remote displays - **Integration work** - Elevator recall, HVAC, door release - **Annual testing** - Certification documentation required ## 2024 Fire Code Adoption Plano adopted the **2024 International Fire Code (IFC)** effective August 1, 2024. Key requirements: ### NFPA 72 Compliance The 2024 IFC references NFPA 72 for fire alarm design and installation standards: - Device spacing requirements - Audibility and intelligibility requirements - Secondary power requirements - Documentation requirements ### Voice Evacuation Required in: - High-rise buildings - Assembly occupancies over 300 - Covered malls - Healthcare facilities ## Permit Application Process ### Step 1: Fire Marshal Plan Review Submit plans to Fire Prevention for review before construction permit: **Required Submittals:** - Floor plans at 1/8" minimum scale - Device locations with coverage calculations - Riser diagram with device counts - Equipment specifications - Battery calculations - Voltage drop calculations - Sequence of operations - **SFMO license documentation** ### Step 2: Plan Review Period - **Standard review:** 10-15 business days - **Complex projects:** May require additional time - **Resubmittals:** 5-10 business days ### Step 3: Obtain Construction Permit After fire alarm approval: - Apply for electrical/building permit - Reference approved fire plans - Pay permit fees ### Step 4: Inspections - **Rough-in inspection** - Before wall/ceiling closure - **Final inspection** - Complete system test ## Texas SFMO Licensing ### Required Licenses All fire alarm work requires SFMO licensing: - **Fire Alarm Superintendent (FAP)** - Project oversight - **Fire Alarm Technician (FAT)** - Installation work - **Alarm Planning Superintendent (APS)** - Plan signatures ### License Verification Plano verifies SFMO licensing during plan review. Maintain current license status. ### NICET Certification While not legally required, many projects specify: - NICET Level II minimum for technicians - NICET Level III for project managers - NICET Level IV for design responsibility ## Inspection Process ### Rough-In Inspection Schedule before closing walls: - Device mounting heights verified - Conduit and pathway inspection - Fire stopping at penetrations - Wire supervision confirmation ### Final Inspection Complete acceptance testing: - **100% functional test** of all devices - **Audibility measurements** documented - **Intelligibility testing** (if voice) - **Battery load test** with calculations verified - **Central station verification** - **Record of completion** submission ## Permit Fees | Service | Fee | |---------|-----| | Plan Review | Based on project size | | Construction Permit | Based on valuation | | Re-inspection | Additional fee | | After-hours | Premium rates | ## False Alarm Impact With ~12,000 false alarms annually in Plano, fire prevention takes this seriously: ### Prevention Measures - Proper detector selection for environment - Construction mode during renovation - Training for building occupants - Regular maintenance schedule ### Documentation - Maintain service records - Document false alarm causes - Provide correction evidence - Train monitoring company contacts ## Pro Tips for Plano Fire Alarm Projects 1. **Use 2024 IFC** - Effective August 1, 2024 2. **Submit Complete Packages** - Missing items delay review 3. **Include APS Signature** - Required on all plans 4. **Plan for Voice Requirements** - More occupancies require it ## Timeline | Phase | Duration | |-------|----------| | Plan Review | 10-15 business days | | Permit Issuance | 1-2 days after approval | | Rough-In Inspection | 24-48 hour scheduling | | Final Inspection | 24-48 hour scheduling | ## Contact Information **Plano Fire Prevention** - Phone: (972) 941-7143 - Address: 1520 K Avenue, Suite 170, Plano, TX 75074 **Plano Development Services** - Permit Portal: www.plano.gov/permits - Phone: (972) 941-7151 **Texas State Fire Marshal Office** - Website: www.tdi.texas.gov/fire - Phone: (512) 676-6000 ## Stay Ahead of Permit Activity Want to know when fire alarm projects hit permits in Plano before they reach bid boards? [LVN Signal](https://www.lowvoltagenation.com/signal) monitors permit activity across Texas and alerts you to opportunities the moment they are filed. → [Explore Signal](https://www.lowvoltagenation.com/signal) --- *Last verified: January 2026. Requirements may change. Contact Plano Fire Prevention for current requirements.*

Join 35,000+ Low Voltage Pros

Get weekly permit updates, tool deals, job opportunities, and industry news. No spam, unsubscribe anytime.