Access Control Permit Requirements in Orem, Utah
Join Low Voltage Nation — Find project opportunities and showcase your company to thousands of industry professionals
Complete guide to access control permit requirements in Orem, Utah. Learn when permits are needed, contractor licensing, fire alarm integration, and the application process.
Access Control Permit Requirements in Orem, Utah
Installing an access control system in Orem? Whether you're upgrading a commercial facility with card readers, installing biometric systems, or adding electronic locks to a multi-tenant building, understanding the local permit and licensing requirements is essential for a compliant installation.
This guide covers everything contractors and property owners need to know about access control permits in Orem, Utah—including when permits are required, contractor licensing, and the application process.
Quick Answer: Do You Need a Permit?
Generally no for standalone access control. Standalone access control installations using low-voltage wiring (under 50 volts) typically do not require separate electrical permits in Orem. However, permits may be required if the installation involves electrical modifications, door hardware changes affecting fire egress, or integration with fire alarm systems. If your system connects to monitored alarm service, alarm registration is required.
When Are Permits Required for Access Control?
Here's when you'll likely need permits for access control installations in Orem:
- New construction - Access control installed as part of new building construction must be included in the overall building permit
- Fire alarm integration - Systems that unlock doors on fire alarm activation require fire alarm permits and inspections
- Door hardware modifications - Replacing doors or hardware that affects fire egress may require building permits
- Electrical modifications - Installing dedicated circuits for electric strikes, mag locks, or access control panels
- Structural penetrations - Routing cables through fire-rated assemblies requires proper firestopping
- ADA compliance changes - Modifying doors or adding automatic operators for accessibility
What Work Is Typically Exempt?
Under Utah Code Section 58-55-305, the following low-voltage access control installations are generally exempt from electrical permits:
- Class 2 and Class 3 power-limited circuits under 50 volts
- Card reader installations using existing door hardware
- Keypad and biometric reader installations
- PoE-powered access control devices
- Wireless access control components
- Communication wiring for access control panels
Important: Even when electrical permits aren't required, verify with Orem Development Services whether your specific project scope needs permits.
Does Orem Require Alarm Registration?
Access control systems that connect to monitored alarm service may be subject to Orem's alarm ordinance (Article 9-4):
- Alarm permit required - If your access control system is connected to a monitored alarm that dispatches emergency services
- Permit fee - Free of charge from Orem Police Department
- False alarm fees - Begin with the 4th false alarm within a calendar year
- Key holders required - Must provide 3 responsible parties who can respond within 30 minutes
Register at Orem Alarm Permits.
Note: Standalone access control systems that only control door access (without alarm monitoring) typically do not require alarm registration.
Do You Need a Contractor License?
Yes. Utah requires contractors performing access control work to hold proper licensing through the Division of Professional Licensing (DOPL):
- Low Voltage Technician License - For systems operating at 95 volts or less
- Burglar Alarm Company License - If installing systems that connect to alarm monitoring
- Minimum 4 years experience - Required for low voltage license
- Pass DOPL written exam - Covers access control, fire alarms, security systems, and structured cabling
For complete licensing requirements, see our Utah Low Voltage License Guide.
How Do You Apply for a Permit?
If your access control project requires permits, here's the process:
Step 1: Prepare Documentation
Gather required documents:
- Building permit application (if door modifications)
- Floor plans showing reader and panel locations
- Door schedule identifying hardware changes
- Single-line diagrams for power and communication
- Fire alarm integration drawings (if applicable)
- ADA compliance documentation for automatic operators
Step 2: Submit Application Online
Orem requires online permit submittal:
- Online Portal: Orem Building Permits
- In Person: Development Services, 56 North State, Orem, UT 84057
- Phone: (801) 229-7060
Step 3: Plan Review
Plans are reviewed for code compliance including fire egress requirements, ADA accessibility standards, fire alarm integration compliance, and electrical code requirements. Orem enforces 2021 IBC and 2020 NEC.
Step 4: Inspections
Schedule required inspections through the building permit portal:
- Rough-in inspection - Before walls are closed
- Fire alarm inspection - If integrated with fire system
- Final inspection - Upon project completion
What About Fire Alarm Integration?
Access control systems often integrate with fire alarm systems for emergency egress. This integration has specific requirements:
Free Egress Requirements
- Fail-safe operation - Doors on egress paths must unlock on fire alarm activation
- Power failure unlock - Egress doors typically must fail unlocked
- Manual release - Request-to-exit devices must allow immediate egress
Permit Requirements
- Fire alarm permits required for integration modifications
- State Fire Marshal certified technicians must perform fire alarm work
- Testing and documentation requirements per NFPA 72
- Orem Fire Prevention handles plan reviews for fire-related systems
What About Residential vs Commercial Projects?
Residential Access Control
For single-family homes in Orem, access control installations typically do not require permits when:
- Using low-voltage powered devices
- Not modifying existing door hardware structurally
- Not affecting fire egress from the home
- Installing smart locks, video doorbells, or gate access
Commercial Access Control
Commercial projects have additional considerations:
- ADA compliance - Automatic door operators must meet accessibility standards
- Fire egress - Cannot impede emergency evacuation
- Industry requirements - Healthcare (HIPAA), financial (PCI DSS), and other regulated industries may have specific requirements
- 2021 IBC compliance - Orem enforces current building codes
Pro Tips from Experienced Contractors
- Verify fire egress requirements first - Always confirm door hardware doesn't impede emergency egress before installation
- Coordinate with fire alarm contractor - If integrating with fire systems, involve qualified fire alarm technicians early
- Document door schedules - Create detailed records of all hardware changes for building management
- Consider power failure scenarios - Plan for fail-safe vs fail-secure based on door function and egress requirements
- Use UL-listed equipment - Ensure all access control hardware meets applicable standards
- Plan network infrastructure - IP-based systems need proper network segmentation for security
- Register alarm if monitored - Complete alarm permit registration before connecting to monitoring service
Contact Orem Development Services
For questions about permit requirements for your specific access control project:
- Address: 56 North State, Orem, UT 84057
- Phone: (801) 229-7060
- City Code Questions: (801) 229-7058
- Website: Orem Community Development
Stay Ahead of Permit Activity
Want to know when access control projects hit permits in Orem before they reach bid boards?
LVN Signal monitors permit activity across Utah and alerts you to opportunities the moment they're filed.
Related Permit Guides for Orem
Tags
Join 35,000+ Low Voltage Pros
Get weekly permit updates, tool deals, job opportunities, and industry news. No spam, unsubscribe anytime.