Jobs & Projects
Permits

Structured Cabling Permit Requirements in Mohave County, Arizona

January 19, 2026
02:52 PM

Join Low Voltage Nation — Find project opportunities and showcase your company to thousands of industry professionals

Mohave County, AZ structured cabling permits: contractor licensing, TIA standards, and network cabling guidelines for Kingman.

Structured Cabling Permit Requirements in Mohave County, Arizona

Quick Answer: Structured cabling installations in Mohave County typically do not require a dedicated low voltage permit. Data and voice cabling is generally exempt. However, contractors must hold an Arizona ROC C-67 or CR-67 license for projects over $1,000. The county follows 2018 International Building Codes and 2017 NEC.

When Are Permits Required?

Generally Exempt (No Permit Required)

  • Data cable installation (Cat5e, Cat6, Cat6a)
  • Fiber optic cable runs
  • Voice and telephone cabling
  • Patch panel and rack installations
  • Wireless access point cabling

Permits May Be Required

  • Electrical permits - For new circuits powering network equipment
  • Building permits - For fire-rated assembly penetrations
  • Tenant improvement - Cabling in TI permit scope

Mohave County Development Services

Contact Information

Current Codes

  • 2018 International Building Codes
  • 2017 National Electrical Code

Arizona Contractor Licensing

License Classifications

Classification Type Bond
C-67 Commercial $15,000
R-67 Residential $9,000
CR-67 Dual $15,000

For complete licensing information, see our Arizona Low Voltage Contractor License Guide.

Industry Standards

TIA/EIA Standards

  • ANSI/TIA-568.1-E - Commercial Building Cabling
  • ANSI/TIA-606-C - Administration Standard
  • ANSI/TIA-607-D - Bonding and Grounding

Cable Categories

Category Speed Application
Cat5e 1 Gbps Legacy, voice
Cat6 10 Gbps (55m) Standard commercial
Cat6a 10 Gbps (100m) High performance, PoE++

Fees and Timeline

Fee Type Amount
Low Voltage Work None (generally exempt)
Electrical Permit $50-$200 if needed

Pro Tips

  • Use plenum cable - Required in air handling spaces
  • Test all cables - Certification testing for warranty
  • Desert climate - UV-rated for outdoor runs
  • Document everything - As-built drawings expected
  • Label properly - TIA-606 labeling standards

Stay Ahead of Permit Activity

Want to know when structured cabling projects hit permits in Mohave County before they reach bid boards?

LVN Signal monitors permit activity across Arizona and alerts you to opportunities the moment they are filed.

→ Explore LVN Signal

Related Permit Guides

Summary

  • No dedicated low voltage permit
  • ROC C-67 or CR-67 license required over $1,000
  • Electrical permits only for new circuits
  • TIA/EIA standards compliance expected

Contact Mohave County at (928) 753-9141 for questions.

Tags

#permits
#arizona
#structured-cabling
#licensing
#mohave-county

Join 35,000+ Low Voltage Pros

Get weekly permit updates, tool deals, job opportunities, and industry news. No spam, unsubscribe anytime.