Article

Structured Cabling Permit Requirements in McKinney, Texas

January 24, 2026

Join Low Voltage Nation — Find project opportunities and showcase your company to thousands of industry professionals

Complete guide to structured cabling permit requirements in McKinney, Texas. Low-voltage permits for commercial. No state license required. 2024 codes adopted.

# Structured Cabling Permit Requirements in McKinney, Texas **Quick Answer:** Structured cabling installations in McKinney, Texas typically require low-voltage electrical permits for commercial projects involving ceiling penetrations or major infrastructure. Texas does not require a state license for data cabling work. ## Do I Need a Permit for Structured Cabling in McKinney? McKinney requires permits for structured cabling when: - **Commercial new construction** - Included in overall electrical permit - **Tenant improvement** - Major cable infrastructure changes - **Fire-rated assembly penetrations** - Ceiling and wall penetrations - **Riser installations** - Vertical runs between floors - **Plenum space work** - Above-ceiling in air handling areas ### Generally Exempt - Adding drops to existing infrastructure - Patch panel work in existing telecom rooms - Cable termination and testing - Residential low-voltage cabling ## McKinney Building Codes McKinney adopted the **2024 International Building Code** which references: ### NEC Requirements (Article 800) - Communications circuit requirements - Cable type ratings (plenum, riser, general) - Separation from power circuits - Grounding and bonding requirements ### Fire Code Requirements - Firestopping at rated penetrations - Plenum-rated cables in air handling spaces - Cable routing to maintain egress paths ## Permit Application Process ### Step 1: Determine Permit Need Contact McKinney Development Services to verify permit requirements for your specific project scope. ### Step 2: Submit Application Through the online permit portal: - Create account - Select low-voltage electrical permit - Upload project documentation - Pay fees ### Step 3: Required Documentation For permitted work: - **Floor plans** showing cable routes - **Riser diagrams** for multi-floor runs - **Firestopping details** at rated assemblies - **Cable specifications** (plenum ratings) ### Step 4: Inspection - Rough-in inspection before concealment - Final inspection after completion ## Texas Licensing (None Required) ### State Level Texas does not require a state license for structured cabling: - **No TDLR requirement** - Low-voltage data cabling exempt - **No PSB requirement** - Unless security integration - **No SFMO requirement** - Unless fire alarm integration ### Industry Certifications (Recommended) - BICSI RCDD - Design certification - BICSI Technician - Installer certification - Manufacturer certifications - For warranty compliance ## Code Compliance ### NEC Chapter 8 (Communications) - Article 800 - Communications circuits - Article 770 - Optical fiber cables - Proper grounding at building entrance - Separation from power cables ### TIA Standards - TIA-568 - Cabling standards - TIA-569 - Pathways and spaces - TIA-606 - Labeling standards - TIA-607 - Grounding standards ### Fire Protection - Use plenum-rated cables (CMP) in air handling spaces - Use riser-rated cables (CMR) in vertical shafts - Firestop all penetrations per UL system ## Inspection Requirements ### Rough-In Inspection Before concealing cables: - Pathway supports installed correctly - Firestopping materials ready - Separation from power maintained - Proper cable types used ### Final Inspection After completion: - All terminations complete - Labeling per TIA-606 - Firestopping sealed properly - Test results available ## Permit Fees | Service | Fee | |---------|-----| | Low-Voltage Electrical | Based on valuation | | Minimum Fee | $50+ | | Re-inspection | Varies | ## Timeline - **Permit Review:** 3-5 business days - **Simple Projects:** Same-day to 2 days - **Inspection:** 24-48 hour scheduling ## Pro Tips for McKinney Cabling Projects 1. **Verify Permit Need** - Call Development Services first 2. **Use 2024 Codes** - McKinney adopted latest cycle 3. **Document Firestopping** - Photos and product data 4. **Test Everything** - Provide test reports with project ## Best Practices ### Cable Management - Follow TIA-568 installation practices - Maintain bend radius requirements - Use appropriate support spacing - Label per TIA-606 standards ### Documentation - Provide as-built drawings - Include test results - Document firestopping systems - Maintain product certifications ## Contact Information **McKinney Development Services** - Permit Portal: City website - Phone: (972) 547-7480 - Address: 221 N. Tennessee Street, McKinney, TX 75069 **McKinney Fire Marshal** (for firestopping questions) - Phone: (972) 547-2850 ## Stay Ahead of Permit Activity Want to know when structured cabling projects hit permits in McKinney before they reach bid boards? [LVN Signal](https://www.lowvoltagenation.com/signal) monitors permit activity across Texas and alerts you to opportunities the moment they are filed. → [Explore Signal](https://www.lowvoltagenation.com/signal) --- *Last verified: January 2026. Requirements may change. Contact McKinney Development Services for current requirements.*

Join 35,000+ Low Voltage Pros

Get weekly permit updates, tool deals, job opportunities, and industry news. No spam, unsubscribe anytime.