Fire Alarm Permit Requirements in Davis County, Utah
Join Low Voltage Nation — Find project opportunities and showcase your company to thousands of industry professionals
Complete guide to fire alarm permit requirements in Davis County, Utah. Learn about permits, NICET certification, Utah State licensing, and inspection requirements.
Fire Alarm Permit Requirements in Davis County, Utah
Installing fire alarm systems in Davis County requires permits from the county and proper licensing from the Utah State Fire Marshal's Office. Davis County's Community and Economic Development Department works with the Fire Marshal to ensure fire and life safety code compliance for all fire alarm installations.
Quick Answer: Do You Need a Permit?
Yes, fire alarm installations require permits. Davis County requires permits for all new fire alarm system installations, modifications, and additions. Plans must be submitted and approved before installation begins, and final inspections are required before system activation. Fire alarm work also requires licensing through the Utah State Fire Marshal.
What Fire Alarm Work Requires a Permit in Davis County?
The following fire alarm work requires a permit:
- New fire alarm system installations
- Additions or expansions to existing systems
- Modifications to system configuration or device layout
- Replacement of fire alarm control panels
- Installation of voice evacuation systems
- Smoke control system integration
- Mass notification system installations
- Carbon monoxide detection systems
When Is a Permit NOT Required?
Some minor fire alarm work may not require a separate permit:
- Replacing like-for-like devices (same model detector, same location)
- Programming changes that don't affect zone configurations
- Routine maintenance and testing
- Battery replacement in existing devices
Always verify with Davis County before proceeding with any fire alarm work.
Do You Need a License to Install Fire Alarms in Utah?
Yes. Utah requires fire alarm technicians to be certified by the Utah State Fire Marshal's Office. There are three certification levels:
Basic Fire Alarm Technician
- Entry-level certification for those new to the industry
- Employers have 90 days to prepare new employees for the exam
- Must pass open-book exam with minimum 70% score
- Must complete Manipulative Skills Task Book within 60 days
- Work must be supervised by a higher-level certified technician
- NICET Level I certification waives the exam requirement
Fire Alarm Technician
- Can work on systems in buildings up to four stories
- Must pass all Basic requirements plus written exam on testing and maintenance
- NICET Level II certification is equivalent
Master Fire Alarm Technician
- Can work on any fire alarm system including high-rise buildings
- Qualified for voice alarm/evacuation and smoke control systems
- Can perform annual inspections and tagging
- NICET Level III or IV certification is equivalent
For complete licensing requirements, see our Utah Low Voltage License Guide.
How to Apply for a Fire Alarm Permit in Davis County
- Prepare plans: Include complete system design with device locations
- Submit online: Use the Davis County online permit portal
- Plan review: County reviews for NFPA 72 and code compliance
- Permit issuance: Upon plan approval
- Installation: Work must be performed by licensed contractor
- Testing: Contractor tests all components per manufacturer specs
- Statement of compliance: Written statement required before final inspection
- Final inspection: Inspector verifies system operation
- Tagging: System tagged with State-approved fire alarm tag
Plan Submittal Requirements
- Complete floor plans with device locations
- Riser diagrams showing all circuits
- Equipment cut sheets and specifications
- Battery calculations
- Voltage drop calculations
- Owner name, property address, and building permit number
- Contractor information and license verification
What Are the Permit Fees in Davis County?
| Permit Type | Estimated Fee |
|---|---|
| Minimum permit (single inspection) | $202 |
| Fire alarm permit with plan review | $250-$500+ |
| Commercial system permit | Varies by project scope |
| Re-inspection fee | $75+ |
Fees vary based on system size and complexity. Contact Davis County for exact quotes.
How Long Does the Permit Process Take?
| Stage | Typical Timeline |
|---|---|
| Plan review (residential) | 3-5 business days |
| Plan review (commercial) | 5-15 business days |
| Inspection scheduling | 1-3 business days |
| Final inspection | Same day if passed |
Code Requirements for Fire Alarm Systems
Davis County enforces the following standards:
- NFPA 72: National Fire Alarm and Signaling Code
- International Fire Code Chapter 9: Fire protection systems
- Utah Administrative Rules R710-4 and R710-11: State Fire Marshal requirements
Circuit Requirements
- Initiating device circuits: Must be Class A per NFPA 72
- Notification appliance circuits: Must be Class A per NFPA 72
- Class A wiring provides redundancy for circuit integrity
Annual Inspection and Tagging Requirements
Fire alarm systems require annual inspection and tagging:
- Inspections must be performed by a Master Fire Alarm Technician
- Systems must be tagged with State-approved fire alarm tags
- Inspection records must be maintained
- Deficiencies must be corrected promptly
- Tag requirements detailed in R710-11 rule
Residential vs Commercial Fire Alarm Permits
Residential Projects
- Simpler systems with fewer devices
- Faster plan review process
- Lower permit fees
- Focus on smoke detectors, CO detectors, and interconnected devices
Commercial Projects
- More complex systems requiring detailed plans
- Voice evacuation systems common in larger buildings
- Integration with sprinkler monitoring, elevator recall, HVAC shutdown
- Smoke control systems in high-rise buildings
- Mass notification system requirements
Background Check Requirements
Fire alarm technician applicants must complete background checks:
- Utah BCI (Bureau of Criminal Identification) check required
- If you've lived outside Utah within 5 years, additional state background checks needed
- Bring BCI to testing appointment - applicants without BCIs cannot test
Pro Tips from Contractors
- Verify jurisdiction first: Cities within Davis County have their own requirements
- Test before calling for inspection: Complete all contractor testing before final inspection
- Prepare compliance statement: Written statement of compliance required before final
- Plan for annual maintenance: Budget for yearly inspections and tagging
- Keep NICET current: NICET certifications streamline the Utah licensing process
- Include building permit number: Plans without this information may be delayed
Davis County Contact Information
- Department: Community and Economic Development
- Address: 61 S Main Street, Room 304, Farmington, UT 84025
- Phone: (801) 451-3279
- Website: daviscountyutah.gov/ced/planning/building-permits
Utah State Fire Marshal Contact
- Fire Alarm Licensing: Jana DeMille - jana.demille@utah.gov
- Main Office: (801) 256-2390
- Website: firemarshal.utah.gov
Stay Ahead of Permit Activity
Want to know when fire alarm projects hit permits in Davis County before they reach bid boards?
LVN Signal monitors permit activity across Utah and alerts you to opportunities the moment they're filed.
Related Permit Guides for Davis County
Tags
Join 35,000+ Low Voltage Pros
Get weekly permit updates, tool deals, job opportunities, and industry news. No spam, unsubscribe anytime.